The Coastal Development Permit, Explained

A coastal development permit is the approval California requires before almost anything is built, graded or subdivided in the coastal zone. In most places you apply to the city or county, which checks the project against its Local Coastal Program, and some decisions can then be appealed to the California Coastal Commission.

Updated November 2026

What a Coastal Development Permit Is

The permit comes from the California Coastal Act of 1976. Under the Act, development in the coastal zone generally may not begin until a coastal development permit, usually shortened to CDP, has been issued by the Coastal Commission or by a local government.

Most permits are local. Once the Commission certifies a city's or county's Local Coastal Program, permit authority passes to that city or county. According to the Commission, local governments now handle about 75 percent of applications, and nearly 90 percent of the coastal zone is covered by a certified program.

A CDP is a planning approval. It comes before the building permit, not instead of it. After the CDP is final, the plans still go through building plan check.

Where the Coastal Zone Is

The coastal zone runs the length of the state. By statute it generally reaches 1,000 yards inland from the mean high tide line. In developed urban areas it is usually narrower. In significant habitat and recreation areas it extends to the first major ridgeline or five miles inland, whichever is less.

Malibu and the Santa Monica Mountains are one of the wide parts. The entire City of Malibu is inside the zone, and in the unincorporated mountains behind it the zone extends roughly five miles from the shore. A parcel can be well up a canyon, out of sight of the water, and still need a coastal permit.

What Counts as Development

The Coastal Act defines development broadly. It covers placing or building any structure, grading, and changing the density or intensity of use of land, which includes subdivisions and lot splits. In practice a new house, an addition, a pool, a driveway cut into a slope and a new septic system are all development. Malibu states plainly that installing a new onsite wastewater system requires a CDP.

Small projects can be exempt or handled at the counter. Malibu's own example is a simple interior remodel. The planner decides, so ask before assuming.

Who Issues the Permit in and Around Malibu

A Malibu mailing address does not tell you which office reviews a project. Three bodies are involved.

Where the parcel isWho issues the CDPThe rules it applies
Inside the City of MalibuCity of Malibu Planning DivisionThe Malibu Local Coastal Program, adopted by the Coastal Commission on September 13, 2002
Unincorporated Santa Monica MountainsLos Angeles County Department of Regional PlanningThe Santa Monica Mountains Local Coastal Program, certified on October 10, 2014
Tidelands, submerged lands and public trust landsCalifornia Coastal CommissionThe Coastal Act itself

Each Local Coastal Program has two parts: a Land Use Plan, which sets policy, and an implementation plan, which holds the zoning and the permit procedures. In the hills, the city boundary can run between neighboring parcels, so confirm the jurisdiction before anything else. The rest of this guide follows the City of Malibu's process.

The Kinds of Approval in Malibu

  • Over the counter or exempt. Very simple work that the planner can clear without a coastal permit.
  • De minimis waiver. For minor work, the City can waive the permit requirement under its Local Coastal Program.
  • Administrative coastal development permit. A staff-level permit, decided by the Planning Director and reported to the Planning Commission. Neighbors within 500 feet are sent a notice of the application.
  • Regular coastal development permit. Decided by the Planning Commission at a public hearing. A new house on vacant land should expect this route.

The Steps for a Regular Permit, in Order

This is the sequence in the City's own flowchart and application brochure.

  1. Talk to a planner. Confirm whether a CDP is needed and which kind. The City also publishes a pre-design meeting handout.
  2. Submit the application to the Planning Division, by appointment, with the plans and reports listed below.
  3. Completeness review. If anything is missing, the planner sends a letter within 30 days.
  4. Specialist review. The project is routed to the City Biologist, City Geologist, Coastal Engineer, Public Works and Environmental Health. The applicant takes the plans to the Los Angeles County Fire Department for its approval.
  5. First notices. A courtesy notice is mailed to neighbors, typically within the first four to six weeks, and a notice of the application is posted on the property.
  6. Story poles. Where a visual analysis is required, poles are set up on site to show the height and position of the building.
  7. Conformance and environmental review. The planner checks the project against the Local Coastal Program and staff prepares the environmental document. Some projects also go to the Environmental Review Board.
  8. Hearing notice. Notice is published and mailed to owners and occupants within 500 feet, or 1,000 feet in the RR-10, RR-20 and RR-40 zones.
  9. Planning Commission hearing. The Commission adopts a resolution approving or denying the permit, usually with conditions. A local appeal period follows.
  10. Notice of final action. The City notifies the Coastal Commission. If the project is in an appealable area, the Commission's appeal period begins.
  11. Building plan check. After every appeal period has ended, the plans are stamped and move to Building Safety.

What You Submit

The City's brochure lists the package. For a new house, expect most of the following.

  • A full set of plans: site survey, site plan, color-coded slope analysis, architectural plans, and a grading, drainage and erosion control plan.
  • Proof of ownership, and a title report for a vacant parcel.
  • A biological inventory.
  • Geology and soils reports, which are required for most projects.
  • A septic plot plan for the onsite wastewater system.
  • A preliminary hydrology report, where the project adds more than 500 square feet of impermeable surface or includes grading or drainage work.
  • A wave uprush report, for beachfront lots.
  • A radius map and mailing labels for the neighbor notices.
  • A report on feasible alternatives.

After a first review the City may also ask for an archaeological survey, a visual analysis with story poles, a native tree inventory or a slope stability analysis.

The reviewers are looking at a short list of things: the geology of the site, sensitive habitat, whether the septic system can serve the house, the effect on views, and whether the project meets the development standards.

Size and Height Limits to Know Early

Malibu caps the size of a house by lot area. The measure is total development square footage, worked out from the net lot area with a sliding formula. The City's handout gives the example of a 2.76-acre parcel, which is allowed 9,220 square feet, and notes that a lot of five acres or more is capped at 11,172 square feet. Net area leaves out street easements and slopes of 1:1 or steeper, so the usable figure can be lower than the acreage suggests. Beachfront lots are exempt from the formula, and sites with sensitive habitat can face tighter limits.

The base height limit for a house is 18 feet. Taller designs, generally up to 24 feet with a flat roof or 28 feet with a pitched roof, need site plan review. These standards are amended from time to time, so check the current code before you design to them.

Appeals to the Coastal Commission

Not every local decision can be appealed. Appeals are limited to certain areas, chiefly projects between the sea and the first public road, within 300 feet of a beach or coastal bluff, or within 100 feet of a wetland or stream. The City and the Commission keep maps of these areas.

Where an appeal is allowed, the window is ten working days, counted from the day the Commission receives the City's notice of final action. That is about two weeks. The Commission says it hears roughly 40 to 60 appeals a year across the state.

How Long It Takes and What It Costs

The City publishes the first milestones, not a total. A new house on a hillside lot goes through several rounds of specialist review, a public hearing and one or two appeal windows. Plan in months, not weeks, and ask the Planning Division or your architect for a realistic estimate for the specific site.

Application fees are set by City Council resolution in the City's fee schedule, and the specialist reviews carry their own fees. The technical reports, the survey and the design work usually cost more than the application itself. Ask for the current schedule before you budget.

Rebuilding After a Fire Is Treated Differently

The Coastal Act has long exempted the replacement of a structure destroyed by a disaster. After the January 2025 fires, the Governor's Executive Order N-4-25 went further and suspended Coastal Act permitting, and environmental review, for rebuilding burned properties within 110 percent of their original size. A later order in July 2025 widened that to single-family rebuilds that are not like-for-like but comply with local zoning. Malibu also asked the Commission in 2025 to certify changes to its Local Coastal Program that streamline rebuilding.

These measures apply to replacing what burned. They do not apply to a first house on vacant land, which follows the regular process above.

What This Means When You Buy Land

The permit path is part of what you are buying. Before you remove contingencies, find out which office has jurisdiction, whether the parcel is in an appealable area, and what the geology, biology and septic studies say. Our guide to buying land in California sets out those checks in order.

Read listing language carefully. A design that is ready to submit has been drawn but not reviewed. A project that is approved has a coastal development permit, with conditions and an expiry date. The two are very different things to buy. Golden Promontory, our land listing above Paradise Cove, comes with a home design that is ready to submit for planning review. It has not been submitted or approved, and the buyer would take it through the process described here.

If you are still deciding where to look, our guide to the best neighborhoods in Malibu compares the parts of the city.

Sources

Checked in November 2026. Rules, fees and prices change; follow the links for the current version.

  1. California Coastal Commission. Coastal development permit application and appeal forms.
  2. California Coastal Commission. Understanding development in California's coastal zone. Fact sheet, January 2025.
  3. California Public Resources Code. Section 30103, the coastal zone.
  4. California Coastal Commission. Definition of development information sheet.
  5. City of Malibu. Local Coastal Program.
  6. California Coastal Commission. City of Malibu Local Implementation Plan. Adopted September 13, 2002.
  7. Los Angeles County Department of Regional Planning. Santa Monica Mountains Local Coastal Program.
  8. Los Angeles County Department of Regional Planning. Coastal planning. The Commission's retained jurisdiction.
  9. City of Malibu. Planning process overview.
  10. City of Malibu. Documentation required for a coastal development permit application.
  11. City of Malibu. Planning process for a coastal development permit, flowchart.
  12. City of Malibu. Planning process for an administrative coastal development permit, flowchart.
  13. City of Malibu. Process for installing a new onsite wastewater system.
  14. City of Malibu. Maximum allowable square footage for a residential parcel.
  15. Malibu Municipal Code. Title 17, residential development standards.
  16. Malibu Municipal Code. Chapter 17.62, development permits. Site plan review above 18 feet.
  17. City of Malibu. Onsite wastewater system options for planning approval. How waivers and administrative permits are decided.
  18. California Public Resources Code. Section 30603, appeals after certification.
  19. California Coastal Commission. The Coastal Commission permit appeal process, frequently asked questions.
  20. Governor of California. Executive Order N-4-25. January 12, 2025.
  21. Snell and Wilmer. Governor Newsom issues Executive Orders N-4-25 and N-14-25 to accelerate fire recovery. The 110 percent limit.
  22. Office of the Mayor of Los Angeles. Executive actions to further streamline Palisades rebuilding. Summary of the July 2025 order, N-29-25.
  23. California Coastal Commission. Staff report on the City of Malibu rebuilding amendment. April 2025.
Keep reading

More From the Journal

Buying land

Buying Land in California, Step by Step

From the offer to the closing: what to check on a parcel, how land is financed and what it costs to hold.

Read the guide
Neighborhoods

The Best Neighborhoods in Malibu

Point Dume, Malibu Colony, Carbon Beach, Broad Beach and the rest, compared for buyers.

Read the guide
The Malibu Journal

Property, Places and Architecture

Every piece from Malibu Bluff, in one place.

See the full Journal
Inquire

Looking at Land in Malibu? Talk to an Agent

Tell us about the property you have in mind, and an agent will send what is known about its permit path.